Install Four Considerations For Mold Temperature Machine

Install Four Considerations For Mold Temperature Machine

Date:Aug 04, 2016

1, the installation of mold temperature should be checked before the circuit is connected properly, there is no circuit reverse or lack equal conditions. Generally do better in China manufacturer of mold temperature machine factory installed circuit reverse-phase or lack of protection function if the mold temperature controller will automatically send an alert.

2, before installation check the heat pump does not appear reversed, if there is need to connect heat pumps and the thermal overload relay switch wires over.

3, mold temperature machine system heat transfer medium is injected, inject the note die temperature in heat transfer media to put the circulation pump running, but not heating, systems such as heat transfer medium full of heated up.

4, and check die temperature machine of liquid bit protection function whether stable, put liquid bit induction device from tank in the out to then put has liquid bit induction device of that head towards Shang, then started cycle pump, zhihou put liquid bit induction device above of head up moved, if die temperature issued alert signal on description liquid bit induction device of function stable, if no alert will put liquid bit induction device Shang of induction head out to replacement direction again new test once, if die temperature also no alert, that description this induction device or control circuit part on has problem has, Check mold temperature machine can start functioning.


Previous: No Information

Next: On Structure Characteristics Of High Temperature And Mold Temperature Machine