[[TitleIndustry]]

Vertical color mixing machine operating procedures

Date:Dec 01, 2018

Vertical color mixing machine operating procedures


First, the beginning of inspection:

1. Check if the mixing blade is loose and the lubrication is good.

2, start the idling, check for abnormal noise and other abnormal conditions, confirm that everything is normal before starting work.

3. Check if there is any foreign matter in the mixing drum and it is clean.

4. Check if the safety switch is flexible and effective.

Second, safe operation:

1. Add various materials to the color mixing machine according to the recipe measurement and quantity required by the process.

2. After the cover is closed, the motor can be started and stirred according to the specified time.

3. It is strictly forbidden to put your hand into the color mixing machine during the operation process. If you need to check it, you should stop it first.

4. If you need to clean the machine, you should cut off the power before you can operate it.

Third, the shutdown operation:

1. After the machine is shut down, the power supply of the machine should be turned off, the leakage switch should be turned off, and the power supply can be turned off before leaving the post.

2. After the machine is shut down, the equipment should be thoroughly wiped clean, especially the parts that rotate with each other. It is strictly forbidden to accumulate dust.

Entry atlas


Previous: Powder Mixing

Next: Vertical color mixing machine features